1100mm C250 gas station fuel tank covers
In domestic market, the products are sold and applied to chemical industry such as Sinopec, PetroChina and CNOOC, and also used in the industries: municipal road, telecom, and clectricity. In oversea market, the products are sold to UK, France, USA, Australia, New Zealand, South Africa and Middle East.
Product Details:
1100mm (43") Dia Composite manhole cover
MC Fuel station covers have the characteristics of safety, corrosion resistance and easy installation. Specially produced for gas stations, with guaranteed quality!

Product information
|
Name |
1000mm C250 gas station fuel tank covers |
|
Material: |
Composit(SMC) |
|
Size: |
Clear opening 1100mm (43") |
|
Weight: |
94kgs |
|
Load: |
C250 |
|
Standard: |
EN124-5 |
Standard Features
●Standard:EN124-5
●Clear opening: 1100mm(43") to D400/C250 /B125/A15
●Material:
Composite Fiberglass and special resin that is moulded at high temperature and high pressure. Composite Sheet Moulding Compound( SMC).

● Double Watertight Seal
1100mm double seal manhole cover have two seals to make sure the high waterproof fuction. One is in the back of the cover and another one is in the frame. Both two seals can be changed if they are needed.

●Anti-Slip surface
M&C's Cover's top surface material has a better slip-resistance value in a wet , dry or worn state to increase safety.

●Lockable
Lockable access covers not only improves site and location security and provides security against theft and malicious damage.

●Customized available
M&C have professional engineering department and we can make the special design and mould for you according your size,pattern,color, load,logo,function request.

Product specification
Unit : MM
|
ltem No. |
Dimensions |
Load Rating | Weight | ||||
|
A |
B |
C |
H |
|
Cover Weight |
Total Weight |
|
|
MC-1100D |
1100 |
1225 |
1120 |
100 |
400KN/D400 |
||
|
MC-1100C |
1100 |
1225 |
1120 |
100 |
250KN/C250 |
70Kg/154lbs |
94Kg/207lbs |
|
MC-1000B |
1100 |
1225 |
1120 |
100 |
125KN/125 |
- |
- |
|
MC-1000A |
1100 |
1225 |
1120 |
100 |
15KN/15 |
- |
- |
FAQ:
Q: What is your payment term?
A:L/C, T/T ,
Q: Where is your loading port ?
A:Ningbo ,Shanghai China or the other customer requested port in China.
Q:How long is your delivery time?
A:If the manhole covers you request are in stock, the delivery time is about 3 days. Customized manhole covers usually take 10-30days deponds on the actual order quantity.
Q:Why do we need to buy from you instead of other suppliers?
A:We are a supplier and factory with rich experience in the design, development, production and supply of composite manhole covers. We have a professional technology, service and sales team. Have complete production equipment, production line and testing equipment.
Our sales personnel must have more than 6 years of experience in composite manhole covers, be familiar with the product standards of different countries, and be familiar with the production process, quality requirements and product customization development process of manhole covers. We can provide efficient and professional services and solutions.
Q:Are there any stocks?
A:For standard composite manhole covers, usually we have some stocks with our own logo or without out logo. If customers have customized or new product development, the actual quantity is generally 10-30 days. Please feel free to contact us and let us know your needs, and we will provide the most accurate information.









